Tidewater Home Improvement LLC
Invoice & Scope of Work · Invoice #343
09/03/2026
Invoice #343
$6,425.88 Amount Due
3 Lighthouse Drive · Hampton, VA 23664
Original Work + Change Work Order #1 (accepted — new tub)
View PDF Pay Online
Project Overview
CustomerBrian Glodt
Address3 Lighthouse Drive, Hampton, VA 23664
Invoice # / Date343 · September 3, 2026
Prior Invoice #340Superseded by this invoice
WorkWall opening + LVP floors (orig) · Bath CWO #1
Included Work
Original Work — as accepted (Invoice #340)
10100General Conditions$275.00
  • Jobsite protection, zipper barricades, daily clean-up, dust control.
10101Trashout / Demo$300.00
  • Demo partition wall dining-kitchen, ceiling strip, flooring tear-out 216 SF, haul-off.
10105Framing$1,750.00
  • Frame open passage header (non-structural) + new 32–36in partition wall enclosing W/D.
10107Drywall$880.00
  • Hang 1/2in–5/8in drywall both sides of opening + W/D wall + patched ceiling; Level 4 finish.
10117LVP Flooring (labor only)$660.00
  • Install owner-supplied LVP 216 SF; subfloor inspect/secure, 2 bags self-leveler.
10120Plumbing$400.00
  • Pull hall bath toilet + vanity before flooring; reset on new wax ring, reconnect.
Change Work Order #1 — accepted (new tub, doors included)
10115Medicine Cabinet$200.00
  • Enlarge the wall opening (wider and taller); install the homeowner-provided cabinet — labor only.
10107Drywall$350.00
  • 16in × 6ft repair section, smooth finish; seal the 2 old washer/dryer hook-up openings. Paint not included.
10117Subfloor$450.00
  • Remove damaged top particle-board layer only (2 layers exist); new plywood layer to floor height.
10120Vanity$250.00
  • Remove existing damaged vanity; install homeowner-provided replacement (same size) with faucet + hook-up.
10120Toilet$150.00
  • Remove and reinstall.
10109Interior Doors (3) — 32"$1,200.00
  • Doors with frames, 32in — 2 left-hand, 1 right-hand. Re-square the frames and replace the doors.
10120New Tub with Surround Insert$1,800.00
  • Tub install, tub drain, upgraded shower valve connection, new drain line if needed.
10100General Conditions (CWO)INCLUDED
  • No charge — covered by the original invoice.
10101Demo & Trashout (CWO)INCLUDED
  • No charge — covered by the original invoice.
Itemized Invoice
Original Work (Invoice #340 — as accepted)
General Conditions$275.00
Trashout / Demo$300.00
Framing$1,750.00
Drywall$880.00
LVP Flooring (labor only)$660.00
Plumbing$400.00
5% Discount (new price)($213.25)
Original subtotal$4,051.75
Change Work Order #1 (accepted — new tub, doors included)
Medicine Cabinet$200.00
Drywall — repair section + seal 2 holes$350.00
Subfloor — top layer + new plywood$450.00
Vanity — remove, install owner's + faucet$250.00
Toilet — remove & reinstall$150.00
Interior Doors (3) — 32", 2 left + 1 right$1,200.00
New Tub with Surround Insert$1,800.00
General Conditions + Demo/Trashout (CWO)$0.00
Change work order subtotal$4,400.00
Total$8,451.75
Credit — deposit received 09/02/2026 (check)($2,025.87)
Amount Due$6,425.88
Payment terms: CWO #1 deposit $2,200.00 to schedule · final $2,200.00 upon completion. Check preferred; pay online via the green button (credit card — Plastiq).
Notes & Terms

This invoice combines the original work (previously Invoice #340, $4,051.75 — $2,025.87 received 09/02/2026 by check) with Change Work Order #1 accepted for the new tub option (interior doors included, $4,400.00). Invoice #340 is superseded.

Notes:
**Jobsite will be left clean once completed.
**Contractor is not responsible for damage caused inside the home while repairing the foundation.

Warranty: **12 months workmanship.

Payment: Check is a preferred method. You can pay by credit card using the link below: https://request.plastiq.com/pay-tidewater-home-improvement-llc — Cards not eligible: Virtual Affirm credit card.