Project Overview
CustomerBrian Glodt
Address3 Lighthouse Drive, Hampton, VA 23664
Invoice # / Date343 · September 3, 2026
Prior Invoice #340Superseded by this invoice
WorkWall opening + LVP floors (orig) · Bath CWO #1
Included Work
Original Work — as accepted (Invoice #340)
10100General Conditions$275.00
- Jobsite protection, zipper barricades, daily clean-up, dust control.
10101Trashout / Demo$300.00
- Demo partition wall dining-kitchen, ceiling strip, flooring tear-out 216 SF, haul-off.
10105Framing$1,750.00
- Frame open passage header (non-structural) + new 32–36in partition wall enclosing W/D.
10107Drywall$880.00
- Hang 1/2in–5/8in drywall both sides of opening + W/D wall + patched ceiling; Level 4 finish.
10117LVP Flooring (labor only)$660.00
- Install owner-supplied LVP 216 SF; subfloor inspect/secure, 2 bags self-leveler.
10120Plumbing$400.00
- Pull hall bath toilet + vanity before flooring; reset on new wax ring, reconnect.
Change Work Order #1 — accepted (new tub, doors included)
10115Medicine Cabinet$200.00
- Enlarge the wall opening (wider and taller); install the homeowner-provided cabinet — labor only.
10107Drywall$350.00
- 16in × 6ft repair section, smooth finish; seal the 2 old washer/dryer hook-up openings. Paint not included.
10117Subfloor$450.00
- Remove damaged top particle-board layer only (2 layers exist); new plywood layer to floor height.
10120Vanity$250.00
- Remove existing damaged vanity; install homeowner-provided replacement (same size) with faucet + hook-up.
10120Toilet$150.00
- Remove and reinstall.
10109Interior Doors (3) — 32"$1,200.00
- Doors with frames, 32in — 2 left-hand, 1 right-hand. Re-square the frames and replace the doors.
10120New Tub with Surround Insert$1,800.00
- Tub install, tub drain, upgraded shower valve connection, new drain line if needed.
10100General Conditions (CWO)INCLUDED
- No charge — covered by the original invoice.
10101Demo & Trashout (CWO)INCLUDED
- No charge — covered by the original invoice.
Itemized Invoice
| Original Work (Invoice #340 — as accepted) | |
| General Conditions | $275.00 |
| Trashout / Demo | $300.00 |
| Framing | $1,750.00 |
| Drywall | $880.00 |
| LVP Flooring (labor only) | $660.00 |
| Plumbing | $400.00 |
| 5% Discount (new price) | ($213.25) |
| Original subtotal | $4,051.75 |
| Change Work Order #1 (accepted — new tub, doors included) | |
| Medicine Cabinet | $200.00 |
| Drywall — repair section + seal 2 holes | $350.00 |
| Subfloor — top layer + new plywood | $450.00 |
| Vanity — remove, install owner's + faucet | $250.00 |
| Toilet — remove & reinstall | $150.00 |
| Interior Doors (3) — 32", 2 left + 1 right | $1,200.00 |
| New Tub with Surround Insert | $1,800.00 |
| General Conditions + Demo/Trashout (CWO) | $0.00 |
| Change work order subtotal | $4,400.00 |
| Total | $8,451.75 |
| Credit — deposit received 09/02/2026 (check) | ($2,025.87) |
| Amount Due | $6,425.88 |
Payment terms: CWO #1 deposit $2,200.00 to schedule · final $2,200.00 upon completion. Check preferred; pay online via the green button (credit card — Plastiq).
Notes & Terms
This invoice combines the original work (previously Invoice #340, $4,051.75 — $2,025.87 received 09/02/2026 by check) with Change Work Order #1 accepted for the new tub option (interior doors included, $4,400.00). Invoice #340 is superseded.
Notes:
**Jobsite will be left clean once completed.
**Contractor is not responsible for damage caused inside the home while repairing the foundation.
Warranty: **12 months workmanship.
Payment: Check is a preferred method. You can pay by credit card using the link below: https://request.plastiq.com/pay-tidewater-home-improvement-llc — Cards not eligible: Virtual Affirm credit card.